On a ‘greenfield’ site a new Build bulk storage/distribution centre including Cool store Facility, loading out areas, atmospherically controlled ‘ripening room with associated Office and Amenities.

Slab on grade with a combination of Insulated Panel, Metal Cladding and other architectural finishes to building façade. Office fitout and full services packages included. Futureproof build to provide facility to adjust areas not temperature controlled on completion to Coolstore areas at a later date. 


A Challenging Project undertaken during multiple seasonal changes with special consideration required for local climatic conditions.


Project Outline


  • Client: Bidvest NZ Ltd
  • Construction Period: February 2015 to August 2015
  • Construction Value: $6,000,000
  • Consultants: Peter Swan Ltd - Architecutral, Structural, Electrical and Mechanical
  • Referee: Phil Struckmann
    (09) 520 8056