Oyster processing factory with coolstore insulated panels, precast walls and floor on suspended structural steel frame, piled to approx 22m depth.

Project Outline


  • Client: Biomarine NZ
  • Construction Period: March 2014 to December 2014
  • Construction Value: $2,700,000
  • Consultants: Hutchinson Engineers
  • Referee: Grant Devine / Devine Projects
    021 422 823