Stage 1 includes demolition of part of the existing building and construction of new building for the BNZ to move into, cafĂ© and office space. 

Stage 2 involves the earthquake strengthening of a heritage building and refurbishment.

Project Outline


  • Client: Tipling Trust
  • Construction Period: December 2013 to October 2014
  • Construction Value: $3,750,000
  • Consultants: Rowe Baetens Architecture / Structure Design Engineers
  • Referee: Grant Devine / Devine Projects
    021 422 823