The Brewcraft office & warehouse was a Design and Build tender. A Quick time frame was required to meet the clients commitments to the tenant. The internal systems boast a Dangerous Goods store rated to Class 1 flamable liquids and a fire sprinkler system capable of goods stored to the 10.5m racking height. The external finishes are Alucobond cladding and long run roofing, with Hardies soffit linings. Internally the main stair is ground & polished concrete with a stack bonded polished blockwork walls.


Project Outline


  • Client: BrewCraft Ltd.
  • Construction Period: 7 months
  • Construction Value: $1,700,000
  • Consultants: Peter Swan Ltd
  • Referee: Phil Meyer-Smith
    09 373 5880