89 Central Park Drive was a negotiated project with Canam Corporate, the building owner. The building has been designed and built to tenant Cato Bolam Surveyors.

The structure is reinforced concrete foundations, columns, slabs, precast suspended floor slabs and a structural steel frame. The building is finished in a combination of precast panels, aluminium cladding and windows with a feature rock veneer.

Due to the successful completion of the base build project, Q also completed the fitout direct with Cato Bolam.


Project Outline


  • Client: tbc
  • Construction Period: September 2009 - April 2010
  • Construction Value: $1,200,000
  • Consultants: Glynn Bilkie Architects