New 2800m2 Office & Warehouse at Lots 14-15 Jomac Place for Thorn Lighting.

Office

-  Reinforced concrete foundations and ground floor slab

-  Precast concrete and structural steel frame with reinforced concrete level 1 floor slab on Comflor

-  Coloursteel metal roofing to the main roof and membrane roofing to the plant area

-  Exterior walls a combination of aluminium windows and curtain wall, aluminium composite cladding and profiled metal cladding

-  Offices, meeting rooms, ablutions, lunch room including all partitioning, ceilings and all finishes.

-  All services including full HVAC, electrical, and fire protection including sprinklers

-  Hot mix carpark and landscaping

Warehouse

-  Reinforced concrete foundations and post tensioned concrete floor slab

-  Precast concrete and structural steel frame

-  Coloursteel metal roofing to the main roof and canopy

-  Exterior walls a combination of precast concrete panels and profiled metal cladding

-  All services including full electrical, and fire protection including sprinklers

-  Concrete yard and landscaping


Project Outline


  • Client: Connel Place Ltd (Mark McKearney)
  • Construction Period: 8 Months (March to November 2016)
  • Construction Value: $5M
  • Consultants: Williams Architects Ltd, BTG Structures, Professional Consulting Services Ltd, Burr Mechanical Consulting Ltd
  • Referee: Quenten Pilgrim, Williams Architects
    09 9666 994