Cato Bolam

89 Central Park Drive was a negotiated project with Canam Corporate, the building owner. The building has been designed and built to tenant Cato Bolam Surveyors.

Project Outline
  • client:Canam Corporate
  • construction period:September 2009 - April 2010
  • project value:$1,200,000
  • consultants:Glynn Bilkie Architects
  • referee:Graham Cameron - contact details available upon request

The structure is reinforced concrete foundations, columns, slabs, precast suspended floor slabs and a structural steel frame. The building is finished in a combination of precast panels, aluminium cladding and windows with a feature rock veneer.

Due to the successful completion of the base build project, Q also completed the fitout direct with Cato Bolam.