Griffins Foods

The Griffins Bar Project was a tendered project. It involved the conversion of the existing warehouses in Ash road Wiri into a food processing line.

Project Outline
  • client:Zane Bailey
  • construction period:Dec 2007 - June 2008
  • project value:$2,000,000
  • consultants:Peter Swan Limited

Our works involved demolition of existing structures and flooring, installing of new drainage and services, strengthening of existing structure and construction of new hygiene rated enclosures within the existing warehouses. The project was completed whilst the rest of the Griffins site was still running. New plant and equipment was integrated into the existing production. All works were completed on time.